Wellington Avenue – Tide Gate Installation

PROJECT OVERVIEW

This project involved the mitigation of stormwater overflows along Wellington Avenue, consisting of the installation of a two compartment 84 TON precast structure into an existing 66″ storm drain line. The structure included two slide gates, a tide flex valve and a trash rack designed to mitigate the inflow of sea water into the city’s existing drainage system while allowing for optimal stormwater drainage. Also required was the modification and upgrade of the existing 3′ x 8′ box culvert outfall.

Project Title: Wellington Avenue – Tide Gate Installation

Location: Newport, Rhode Island


CLIENT

City of Newport

COST

$1,589,650.00

Construction vehicles, including a bulldozer and excavator, working on-site.

EMBRACE OPPORTUNITY

LAY THE FOUNDATION FOR YOUR FUTURE – APPLY NOW

LET’S BUILD
TOGETHER

NEED TO REACH US?

LET’S TALK