MASSDOT – Bridge Replacement
PROJECT OVERVIEW
As part of an ongoing program by the MASSDOT, Bridge No. B06011, located in Bellingham, Massachusetts was selected to be demolished and replaced. The span was originally constructed as a railway overpass. As the railway had long since been abandoned, the new design included replacing the bridge structure with a 24’ diameter precast arch culvert. The design took into consideration future potential use of the abandoned railway as a multiple use path. John Rocchio Corporation was awarded a contract to remove and replace the existing span with a 24’ diameter pre-cast culvert.
Project Title: MASSDOT – Bridge Replacement
Location: Bellingham, Massachusetts
CLIENT
Massachusetts Department of Transportation (MASSDOT)
COST
$2,574,751